产品banner
Your current location : Home >> News >> Company news

Contact us

CHINA JIANGSU JUWEI MACHINERY CO.,LTD

Add:Western industrial Park, Dongtai City, Jiangsu Province, China

ZIP:224217

TEL:+86-515-85422299

FAX:+86-515-85422399

HOT LINE:+86 13661556708

WEB:www.jwhammer.cn

           www.jsjuwei.cn

EMAIL:jwjx@jsjuwei.cn

How to design the structure of diesel hammer pile driver?

2019-07-29

1564729085334773.jpg


Diesel hammer pile driver is this kind of auxiliary mechanical equipment. It can help you to arrange the business volume of work reasonably. It is a very useful mechanical equipment. Its main use in our daily life is very large. Today, people give us relevant explanations on how to design the structure of diesel hammer pile driver


People need to know what is diesel hammer pile driver. This kind of mechanical equipment is composed of cylinder and plunger pump. Its principle is similar to that of single slot two-stroke diesel engine. Diesel pile hammer manufacturers use the powerful working pressure of atomized diesel engine caused by deflagration after high pressure and high temperature to drive high chromium alloy hammer head.


Secondly, from the structural level, people can divide the diesel hammer pile driver into two categories: the type is the branch rod diesel hammer pile driver, the category is the cylinder diesel hammer pile driver.


It takes plunger pump as hammer seat to press on pile cap, and uses cylinder as high chromium alloy hammer head to lift along two guide rods. When piling the foundation, firstly lift the pile to the gantry of the pile frame, then put the diesel engine hammer on the pile top, lower the lifting hook to hang the cylinder, and then loosen the lifting hook to let the cylinder drop into the plunger pump to reduce the enclosed gas in the cylinder, and the cylinder will fall again until the pin outside the engine cylinder pushes the remote rod of the high-pressure oil pump on the hammer seat Spray to the tank, the oil mist meets the high temperature vapor around the ignition point, causing explosive force, so as to carry out the work.


The cylinder is used as the hammer seat of the cylinder hammer pile driver, and the extended cylinder liner inner cavity guiding property is immediately used, and two guide rods are omitted. The plunger pump is a high chromium alloy hammer head, which can exercise up and down and left and right in the cylinder. During the foundation piling, the pile cap under the hammer seat is pressed on the top of the pile, and the plunger pump is raised with a lifting hook. Then the downward impact property is decoupled, and the closed gas in the cylinder is reduced, and the oil pump, explosion, impact and ventilation are carried out.


Label

Last viewed:

Contact Information

jiang su Office

1.png   Add: Western industrial Park, Dongtai City, Jiangsu Province

3.png  ZIP:224217

2.png   TEL:+86-515-85422299

首页底部联系 图标 传真.png  FAX: +86-515-85422399

2.png  HOT LINE:+86 13661556708

首页底部联系 图标 网址.png  WEB :www.jwhammer.cn

                  www.jsjuwei.cn

3.png  EMAIL: jwjx@jsjuwei.cn


Copyright © CHINA JIANGSU JUWEI MACHINERY CO.,LTD

Service support: yangtian network


sitemap | RSS | XML