产品banner
Your current location : Home >> News >> Company news

Contact us

CHINA JIANGSU JUWEI MACHINERY CO.,LTD

Add:Western industrial Park, Dongtai City, Jiangsu Province, China

ZIP:224217

TEL:+86-515-85422299

FAX:+86-515-85422399

HOT LINE:+86 13661556708

WEB:www.jwhammer.cn

           www.jsjuwei.cn

EMAIL:jwjx@jsjuwei.cn

What are the precautions for using pile driver?

2019-07-29

柴油锤厂家


Many large and medium-sized office buildings, there are also many bridge construction, the whole process of subway station capital construction is applied to pile driver, its product category is more, people at the time of selection, diesel hammer manufacturers must choose large and medium-sized reliable pile driver manufacturer with high reputation. You will find that the characteristics of the pile driver are more significant, the key is the steam hammer pile driver, the diesel engine hit one key installation machine, the vibration hammer pile driver. In the application of the pile driver at that time, there are many must pay attention to, then, usually what are the common problems of pile driver application?


At present, with the rapid development of social economy, the use of piling machine equipment is very common. The key is to use high pressure steam to lift the high chromium alloy hammer head. The high chromium alloy hammer head will impact the pile head downward, and then make the pile sink to the ground, which is more suitable for concrete pile and steel sheet pile with small load. In the normal application of the whole process, we must grasp the skillful operation method. The commander staff and the actual operation staff should check each other's data and signals before work, and work closely with each other.


There are also pile drivers and pile caps. The plan of pile caps and pipe columns should be padded. Before application, every spare part of the pile driver should be carefully considered. The starting of the pile driver should be slowly accelerated from low speed to high speed. In the whole process of pile driver application, we should pay close attention to the working voltage and current on the control panel. If we find that there is a differential sound or other conditions, we should immediately terminate the inspection.


Do you know what are the common problems in the application of pile driver? In the application of piling machine equipment, it is necessary to cooperate with each other in water jetting and mud suction. When moving down, it should be suitable for the relevant staff to contact in advance. When lengthening the pipe string or installing the pile cap, the staff must wear safety belt. This is very important. We should also carefully and carefully whether all the machines and equipment of the pile driver are in normal operation and in the whole process of downward movement It is strictly prohibited to carry out the maintenance of mechanical equipment.

Label

Last viewed:

Contact Information

jiang su Office

1.png   Add: Western industrial Park, Dongtai City, Jiangsu Province

3.png  ZIP:224217

2.png   TEL:+86-515-85422299

首页底部联系 图标 传真.png  FAX: +86-515-85422399

2.png  HOT LINE:+86 13661556708

首页底部联系 图标 网址.png  WEB :www.jwhammer.cn

                  www.jsjuwei.cn

3.png  EMAIL: jwjx@jsjuwei.cn


Copyright © CHINA JIANGSU JUWEI MACHINERY CO.,LTD

Service support: yangtian network


sitemap | RSS | XML